Wuhu AUX Smart Manufacturing Industrial Park

Solid Aluminum Cladding // WUHU, ANHUI // COMPLETED 2023

Engineered Solid Aluminum envelope comprising 32,400 m² of 2.5mm & 3.0mm AA3003-H14 PVDF finished in PVDF Fluoropolymer for AUX Group Co., Ltd. // 奥克斯集团 in WUHU, ANHUI.

Project Snapshot domain
Client / Operator AUX Group Co., Ltd. // 奥克斯集团
Building Height Campus HQ & Mega Plants // Up to 42.0 m
Facade Consultant Zhejiang Construction Architectural Design Institute
ALUMAX Scope Office Curtain Wall Cladding, Factory Entrance Canopies
Delivery Mode High-Volume Direct Trailer Shipments
Envelope Area aspect_ratio
32,400 m²

2.5mm & 3.0mm AA3003-H14 PVDF precision architectural cassettes.

Alloy Grade view_in_ar
AA3003 Formed Alloy

High-tensile substrate meeting ASTM & EN standards.

Surface Coating format_paint
PVDF Fluoropolymer

Super-durable weather & UV chalking resistance.

Fire Rating shield
ASTM E84 Class A

Certified non-combustible architectural barrier.

corporate_fare 02 // Project Overview

Mega Intelligent Manufacturing Base Architectural Cladding & Office Facades

The Wuhu AUX Smart Manufacturing Industrial Park (芜湖奥克斯智能制造产业园) is a benchmark architectural development located in WUHU, ANHUI. ALUMAX (Anhui Wanchuang New Materials Co., Ltd.) engineered and supplied over 32,400 m² of high-specification architectural Solid Aluminum envelope assemblies for this landmark structure.

Designed by Zhejiang Construction Architectural Design Institute, the envelope features high-precision 2.5mm & 3.0mm AA3003-H14 PVDF panels finished in PVDF Fluoropolymer. Every component was engineered to withstand local microclimate demands, providing certified ASTM E84 Class A non-combustible life safety, dynamic windload resistance, and long-term atmospheric durability.

Through close coordination with the engineering team of AUX Group Co., Ltd. // 奥克斯集团, ALUMAX provided end-to-end technical optimization, comprehensive factory CNC fabrication, and High-Volume Direct Trailer Shipments to ensure rapid on-site installation and flawless facade alignment.

Client / Operator

AUX Group Co., Ltd. // 奥克斯集团

Primary Stakeholder

Building Height

Campus HQ & Mega Plants // Up to 42.0 m

Structural Metric

Facade Consultant

Zhejiang Construction Architectural Design Institute

Engineering Lead

ALUMAX Scope

Office Curtain Wall Cladding, Factory Entrance Canopies

Full Lifecycle Supply

Delivery Mode

High-Volume Direct Trailer Shipments

Export-Ready Packaging

Panel Caliber

2.5mm & 3.0mm AA3003-H14 PVDF

Core Specification

warning 03 // Project Challenge

High Thermal Efficiency Across Massive Spans & Rapid Industrial Handover

The 300-acre smart manufacturing base required high architectural finish quality across vast office and manufacturing elevations delivered within an aggressive 6-month factory commissioning schedule.

Precision Facade Alignment
On-Site Installation

Precision Facade Alignment

Laser-guided cassette positioning and structural bracket anchorage.

10mm Shadow Reveal Joint & SS316 Concealed Fixing
MACRO DETAIL

10mm Shadow Reveal Joint & SS316 Concealed Fixing

01

Rapid Prefabricated Modular Cassettes

Standardized panel module widths enabled high-speed automated factory punching and bending, allowing daily shipments exceeding 600 m² of finished panels.

02

High Thermal Insulation Integration

Pre-installed high-density mineral wool insulation behind panel cassettes cuts HVAC heat gain across massive building envelopes, supporting LEED Silver certification.

03

Continuous 25-Year Color Retention

Duranar PVDF finish in clean corporate metallic grey provides continuous weather resistance against industrial atmospheric airborne particulates.